Updates on our Backyard Renovation

I’m so excited about the progress we’re making on our Backyard Renovation! So far, we have demolished the entire deck including the second story balcony, stairs and outhouse.  We’ve leveled out the dirt to prepare for the new deck and while everything was torn down, we thought it would be the perfect time to paint our house. So we did that too. And after this poll, we decided to go with the darker color for our house despite the fact that approximately 90+ percent of you guys voted for the lighter color. If you know me well, then you know I am anything but the type to follow the crowd, so it shouldn’t be too much of a surprise.

Right now our backyard is a construction zone. It’s full of dirt and it’s nearly impossible to keep the dogs from tracking all the dirt inside. So don’t expect too many posts about the inside of our house, until we get this backyard renovation completed, because I’m basically constantly cleaning and yet nothing ever seems clean. That’s the life of a full-time working mama in the middle of big home renovations right? We do make time for our kiddos and we love our family time. This past Easter weekend was full of it. Here’s a sweet shot of us at church yesterday after the Easter service.

We spent this weekend out and about, because there’s not too many spots around here to hangout with the construction zone in the back and the front yard off limits because we are trying to grow us some grass. Luckily, we are fortunate to have family with an awesome pool to spend all afternoon Sunday swimming. Meanwhile in our backyard… There is a LOT of dirt and leaves.

We have made some big decisions on the backyard renovation. We decided to do all wood deck (instead of concrete) for the bottom and top story, so that we could keep our live oak. We also decided not to put a roof over the entire deck, just the top balcony (which is off our master bedroom). The top balcony will be covered and screened in. We may add in a roof over the bottom at some point, but for now, our tree gives us plenty of shade and the Tree Lady  says it’s in perfect condition to live on for years to come. You can see the trunk in the picture below.

We have also decided to keep the shell of our backyard shed for now (pictured below).

We have never used this for anything but occasional storage, and had originally planned on tearing it down to make more backyard space for the dogs and kids to play in. However, now that we’re not planning to have a roof put in over the bottom deck, we’re thinking we may take the walls and floors out and keep the supports and the roof to have our own little covered space. Stay tuned to see what we do with it!

I know there is still a lot left to do, but it’s encouraging to see how far we’ve come already when this is where we started.

We can’t wait to share the finished product with you! You can follow us on Instagram (@phillipsflips) to stay in the loop with all of our day to day progress and updates.

 

Our First House (Flip)

In honor of our recent closing day anniversary, I thought it would be fitting to share the before and after photos from our first ever house which later became our first house flip! Technically speaking, I guess we bought and flipped our second house, then bought our 3rd house and flipped our first house. It was a crazy 3 years! More on our Phillips Flips (home flipping stories) here.

On March 21, 2013 we bought our very first house. It was dreamy… and I mean “dreamy” in the sense that you had to dream about what it would look like one day and not what it looked like right when we bought it.

Here’s what it looked like when we bought it:

And the inside:

Check out those floors! The floors on the right of the picture above are linoleum tiles. There was 2 full layers of ceramic tile where you see the tile up there at the top and the carpet to the left was dark green. And about 8 feet inside the front door was a nice little 3-way junction where all 3 of the mixed floors met up for no real reason.

All the bedrooms had that same dark green carpet.

The kitchen was pretty small and awkwardly closed off to the rest of the house. So the first thing we did was grab a sledge-hammer and bust through some walls:

We removed the wall shown above which opened the kitchen to the entryway and a little more to the dining room over to the left.

We removed the upper cabinets that were hanging above the island which opened the headroom up a bit and made the kitchen completely open to the family/TV room.

We ripped up all of the floors to make way for light-colored hardwoods.

And then we got to work! We painted the kitchen cabinets white!

It was much more open with the overhead cabinets out of the way.

We painted the front door this fun minty color and I DIY Frosted the front windows with a little hand cut monogram in the center.

I replaced the fan in the dining room with this Maskros Pendant Lamp from IKEA and we painted the fun accent stripe wall on the side wall over there. That was SO “in” back in 2013!

We gave all the other walls a fresh coat of paint (either white or light gray).

And replaced the dark green carpet with a neutral “greige” color that we found on crazy sale at one of our local carpet/flooring warehouse places. We found just enough carpet to put in our sunken den area and all 3 of our bedrooms. It was meant to be!

I didn’t get a ton of great shots of it, but originally we had vaulted ceilings that were covered in dark wood paneling. We painted over that with white paint and it looked kind of like vaulted shiplap covered ceilings!

With the wall knocked out, the upper cabinets gone and the white paint, the kitchen looked much more open and bright!

And finally, we got around to painting the outside of the house and redoing the roof with light metal panels.

On our first ever house flip, we spent about $10K in renovations:
Flooring: $4,000 (purchased whole sale and installed by a friend of a friend)
New roof: $5,000 (we pulled our own permits and had a friend do the work for us)
Paint: $1,000 (we used a lot of leftover paint that we had sitting around in storage and we may have used plain old white primer on some interior walls- you got to save wherever you can!)

We ended up selling this house for $16K more than we paid for it which was a $6K profit on the sale alone. We also rented it out for several months during some of the transition time while we were in between houses and we made a total of $11,700 in rental income. So all-in-all we made $16,700 on our first flip.

Our Backyard Renovation Plans

I’m finally putting pen to paper on our plans for our backyard, and man is it getting real! We have been saving up for this project since we finished buying our Christmas gifts last year (around mid-December) and we have been planning and getting inspiration for our backyard renovation since June 2015 – when we moved into this house. We’re planning to share all the details of the entire process right here for you to follow along, but for starters, we wanted you to see the “before” photos and share a little bit about our future and upcoming plans for this space.

Welcome to our backyard:

As you can see, the backyard is full of decking- literally. With the exception of our side-yard, a few flower beds and our long concrete driveway, our backyard is almost entirely solid wood. There was a “pool” when we moved in. And by pool, I mean that technically we had an above ground pool that was built into our raised deck, but it could be more accurately described as a broken-down plastic hole used for frog and mosquito breeding. So this was one of the very first things to go. We ripped this all out piece by piece which left us with a giant hole on one side of our yard that can be seen below:

It’s a really unappealing look – not to mention very unsafe for little kids. We’ve been living with this hole over here for almost 2 years now and we are finally ready to tackle this backyard renovation project.

First, we are demoing EVERYTHING! Literally every non-living structure in our backyard is getting ripped out, with the exception of this completely unfinished mother-in-law apartment- which we also have big plans for, but that’s another post for another day.

We recently decided to do the demo of our backyard ourselves instead of paying someone to do it for us. It’s proving to be a slow and arduous process that’s taking even longer than normal because we are having to fit the time in somewhere between our day jobs and parenting 2 little ones under the age of 3, but we are looking forward to getting the most bang for our buck! You can read more about the beginning of our DIY backyard deck demo here.

As of last night, this is how far we had come.

Like I said, it’s a slow process, but even a little progress is still progress, and I’m okay with that.

Once we finish the demo, we plan on rebuilding this second story deck in the same dimensions that it is currently.

The things we are doing differently with the rebuild include ensuring that the posts holding it up will be in the right spots. You can see in this picture below that the second story hangs past the posts that are holding it up and there are no additional supports to the part of the deck that’s hanging over. So those posts will be moved to the corners of the deck to support the entire second story properly.

We will be eliminating a few of the posts holding up the deck as well. Right now we have 4 posts going across the main part of our deck. We will be eliminating 2 of the 4 posts so that the only remaining posts will be the ones on the corners of the upper deck and around the edges where the roof needs to be supported. In the photo below, you would only see the post on the far left of the picture (but it would be moved out to the corner of the deck instead of in the middle).

The floor joists supporting the deck will also be built closer together- they are currently 24 inches apart which is not considered “to code” for the 2 X 4’s they are supporting. We’re going to install modern industrial railings around the upper deck and stairs.

I love the simple black iron railings here from Jordan Iverson Signature Homes

I also love the mixed metal and wood in these railings from Atlantis Rail Systems.

As part of our re-build of the second story, we will be gutting this outhouse- yes we have an outhouse and yes, it is plumbed and officially counts as a 1/2 bath for our home.

It also moonlights as a nice nesting ground for the local squirrels, opossums and small rodents.  So we will be removing it and replacing this spot with a very nicely sealed and (hopefully) waterproof custom storage area that will extend all the way under the stairs.

We originally wanted to do a composite decking solution for our stairs and deck, but after researching and weighing the pros and cons, we ultimately decided that we would rather save the money by doing a wood deck and painting and sealing it. We also made the decision to commit to the yearly maintenance of re-sealing that’s required to keep a wood deck in good condition. We’re planning to use standard pine for the deck and paint it a medium grey color similar to this deck featured on Atlantis Rail Systems website.

But we plan to use cedar posts for all of the supports that we’re going to seal with a clear sealer so we can see the natural wood accents like in this photo from 2Modern.

We are also planning to re-structure and slightly extend the aluminum roof above our deck area. Right now we have 2 different roof lines: one over the second story and another that begins at the top of the railing for the second story and angles down to the end of our deck. You can see what I mean in the photo below:

We are planning to move the bottom roof to meet up with the upper roof-line and also extend it out to go the full length of the upper roof. We are also going to extend the roof across the side of the house a bit to cover the stairs and help keep them from being hit directly by all the elements- which, in Florida, really just includes sunshine and rain. You can see below how the stairs are uncovered right now.

We’re also going to screen in the upstairs balcony and add a door for access to the stairs and another door on the other side for easy roof access in place of the gate we have right now.

Once all of the building/painting/roofing/screening is finished, we will have our concrete guy install some simple polished concrete that will span the entire bottom level for the area that’s under the roof.

We like a medium grey but with natural variations and something with the natural shine of polished concrete (not high gloss). We like something similar to the floors in this updated farmhouse by Archizer.

Or the concrete in the photo below featured in this article by Homedit.

Finally, once we finish everything above, we will frame everything with some minimalist, low-maintenance landscaping and some grass for our dogs.

Phase 2 of the project will include outdoor kitchen plans, a bar, a mounted TV and furniture- but we’re just wrapping our minds (and our budget) around phase 1 for now.

Still left on our to-do list after we finish the demo:

  1. Finalize our drawings and get the architect to sign-off on the final building plans for our second story balcony and stairs.
  2. Pull the permits for the entire project – we will save money by doing this ourselves rather than having multiple contractors pull permits for their own pieces of the work.
  3. Finish collecting quotes for the rebuild of our second story deck, the pouring of our first floor concrete, the rebuild/restructure of our aluminum roof covering and screened in second story balcony.
  4. Bring in dirt to level out our backyard and fill in the holes
  5. Have our aluminum guy demo the current aluminum roof (We’re attempting to reuse anything we can from our current roof since it’s in good condition- so we’re letting the expert handle this part of the demo)
  6. Build the 2nd story balcony and stairs
  7. Rebuild the new aluminum roof
  8. Paint and seal the wood decking on the balcony and stairs
  9. Pick out, order and install some modern iron railings for the second story and stairs
  10. Screen in the second story balcony
  11. Pour and finish the concrete on the first floor
  12. Re-work the backyard landscaping and lay down some sod

We’ll be checking these off our list one by one and keeping you updated as we make our way through it. We hope you enjoy following us throughout this process. You can subscribe to receive email notifications of our updates on our home page.

Update: For more on the plans and status of our backyard renovation, check this post out.